Services
Interim storage for building sites
Interim storage for a building site takes material that is delivered before installation or has no room on site. We receive, check and record it, label it by construction phase and stage it in call-offs as work progresses. This relieves tight Berlin sites; which storage conditions your material needs and which we can meet is clarified in advance.
At a glance
- A building-site interim store receives material before installation and stages it per construction phase.
- It suits construction firms and fit-out trades with little space on site or many deliveries.
- Storage takes place in our warehouse in Großbeeren in the GVZ Berlin Süd freight village.
- Charging is usually per space and week plus staging per call-off; in Berlin our courier service makes the runs.
Where this service sits in the goods flow
- GRGoods receiving
- STStorage
- COCall-off
- PIPicking
- GIGoods issue
Berlin: special use permit or interim storage?
Placing material on public road land in Berlin requires a special use permit for site set-up from the roads and green spaces office; the guide planning interim storage for building sites explains the details. Interim storage away from the site can reduce the area needed. For businesses collecting material for several sites at once, warehousing for trade businesses describes the process per site.
Excluded are furniture, dangerous goods, hazardous substances, chilled goods, pharmaceutical products, files, household or office removals, excavated soil and construction waste. Transport to the site is handled by your forwarder, your merchant or, in Berlin, our courier service; you apply for no-parking zones at the responsible authority.
- Receiving with records: Material is counted on delivery and checked for visible damage. We report discrepancies with a photo before it is stored.
- Labels per phase: Each package is marked with phase, trade or floor. On call-off exactly what the phase needs is staged.
- Call-offs as work progresses: Site management calls off with the agreed notice. Particularly short notice is checked and confirmed in advance.
- Leftovers settled: Whatever is left after completion is counted and stored on or staged for collection under the agreed rule.
How it is charged
Storage per place and week, receiving with labels per phase, staging per call-off. Overview: warehousing costs.
Building-site interim storage step by step
We check whether material, load units and period fit our process and agree labelling and call-off notice with site management.
Once you approve, we receive, label and store the material and stage call-offs with the agreed notice.
How the arrangement runs from request to regular operation is shown in how warehousing works with us.
- Draw up a material list per construction phase
- Agree labelling and call-off notice with site management
- Delivery by merchant or manufacturer with advance notice
- Receiving, labelling, put-away
- Call-offs per phase, staging for collection or delivery in Berlin via our courier service
- Count leftovers after completion and handle them under the rule
Key terms
- Construction and stand building: sector overview: warehousing for construction and stand building
- Construction phase: part of a project carried out separately in time
- Call-off: request for material for a date
- Leftovers: material remaining after completion
Questions and answers: Construction site storage
What can go into building-site interim storage?
Commercial building material on pallets, in packs or crates whose dimensions and weights are known in advance. Excavated soil, waste and dangerous goods are excluded.
How quickly can material be called off?
With the agreed call-off notice. Particularly short notice is checked and confirmed in advance rather than promised across the board.
What happens to leftover material?
It is counted after completion and stored on or staged for collection under the rule agreed beforehand. Any return you agree with your merchant.
What does interim storage for a building site cost?
Usually storage per place and week, receiving with labels and staging per call-off. The items are shown on the warehousing costs page.
Do you also bring the material to the site?
In Berlin our courier service handles that; alternatively your merchant or forwarder collects. We stage the call-off.
Where we offer this
Request
Request for this topic: Construction site storage
Three steps. Anything you do not know yet can be left open.
Details for planning
- Material list with quantities and weights
- Construction phases and planned installation dates
- People responsible for call-offs and notice period
- Collection arrangements
- Rule for leftovers
Prefer to talk directly?
+49 30 346 467 850info@logisticoo.comPhone: Mon–Fri 8am–6pm Berlin time (CET/CEST)