Construction and stand building share the same pattern: material arrives before it is used, is needed in stages and then has to be ready on the date. For construction firms, fit-out trades, stand builders and exhibitors in Berlin and Brandenburg we receive material, label it per construction phase or show, store it and stage it on call-off. Runs within Berlin are handled by our courier service; transport onto the exhibition grounds is arranged by your forwarder.
Construction and stand building compared
What both have in common: the warehouse works from a list – material list per phase or packing list per stand. The more precise the list, the smoother the call-offs.
| Feature | Construction and fit-out | Stand building and exhibitors |
|---|---|---|
| Material | building materials, components, fit-out material on pallets or as long goods | wall systems, graphics, exhibits, connectors in crates |
| Rhythm | construction phases over months | show dates across the year |
| Call-off | per phase, notice agreed with site management | stand per packing list before the build-up date |
| Destination | building site, in Berlin via our courier service | exhibition grounds, via your forwarder |
| Suitable service | building-site interim storage | trade fair storage |
Construction firms and fit-out trades
On tight Berlin building sites there is often no room for material delivered early. Instead of one full delivery, material goes into interim storage and is called off per phase. Whether a special-use permit for public road space would be needed on site and when an external interim store pays off is explained in planning building-site storage.
- Labelling by project, phase and trade
- Call-offs by site management, on request also by subcontractors
- Count of leftovers after completion
Stand builders and exhibitors
Between two shows stand material needs a place where it waits labelled and checked. We store by packing list, check each return to the agreed scope, keep exhibits and stand components separate if required and stage everything for your forwarder on the date. A checklist with timeline is in storing an exhibition stand: checklist; for shows in Berlin see Charlottenburg-Wilmersdorf.
- Count and condition note at every return
- Code per stand or show on package and list
- Staging on the date, coordinated with the forwarder
Typical mistakes in projects
- Material or packing list missing – call-offs turn into searches
- Call-offs without notice, shortly before construction or build-up
- Returns stored unchecked – damage only shows at the next job
- No rule for leftovers
What matters
- Material per phase
- We label packages by construction phase, floor or trade so that call-offs can be assigned unambiguously.
- Stands between two shows
- On receipt we check stand material against the packing list to the agreed scope; before the next show we prepare the available packages for collection against the agreed list.
- Spotting discrepancies early
- Shortages or damage identified at receiving are recorded – leaving time for replacements before build-up day.
- Leftovers
- After completion or the season we count leftovers and handle them under the agreed rule.
Planning questions
- How many construction phases or shows are there, and over what period?
- Which load units arrive – pallets, mesh boxes, crates, long goods?
- Who triggers call-offs?
- Where does the material go – building site, exhibition grounds, workshop?
What we need from you
- Material list or packing list
- Construction phases or show calendar
- Load units, dimensions, weights
- Call-off notice and destinations
Good to know
We do not store dangerous goods, chilled goods, pharmaceutical products, furniture or documents and archive records. Stand furniture and furniture for interior fit-out therefore cannot be stored; system parts, graphics and connectors can.
How it works
- 01
Review
We review the material or packing list, load units and dates and propose labelling and call-off notice.
- 02
Execution
Merchants or stand builders deliver with advance notice; we receive, label and store; call-offs are staged on the agreed date.
Questions and answers: Construction and stand building
Do you store material for building sites in Berlin?
Yes. We store building material per construction phase, stage call-offs and hand them to our courier service for Berlin sites; alternatively merchants or forwarders collect.
Do you store exhibition stands between two shows?
Yes. We store stand material by packing list, check it on return to the agreed scope and prepare it against the agreed list before the next show. Your forwarder handles transport onto the grounds.
Which materials do you not accept?
We do not store dangerous goods, chilled goods, pharmaceutical products, furniture or documents and archive records. This also applies to stand furniture.
What does storage for construction or exhibition material cost?
Usually storage per place and period, receiving with checks and staging per call-off. With your material or packing list we prepare a quote listing every item.
Request
Request for this topic: Construction and stand building
Three steps. Anything you do not know yet can be left open.
Prefer to talk directly?
+49 30 346 467 850info@logisticoo.comPhone: Mon–Fri 8am–6pm Berlin time (CET/CEST)