Storing an exhibition stand: checklist

Storing a stand between shows involves three steps: checking the return after the show against a packing list, storing material labelled by stand or show, and staging it for collection in good time before the next show. Access and transport on the grounds are governed by each show.

An exhibition stand spends most of its time not at the show but in between. Whether it arrives complete and undamaged next time is decided at dismantling and in storage. This guide shows what exhibitors and stand builders should settle before storage – and where the show's own rules for delivery and transport on the grounds begin.

As of: · Editorial team: Lager-Logistik Berlin

At a glance

StepWhoWhat matters
Dismantling and packingexhibitor / stand builderpacking list per crate, labels by stand
Return to storageforwarder / stand buildercollection under the show's dismantling rules
Receipt and storagewarehousing providercount against packing list, damage photos
Staging before the next showwarehousing providerdate, completeness, labelling
Access and transport on the groundsforwarder under show rulesloading zone, access, event time slots

Checklist for exhibitors

  • Packing list per crate with stand and show
  • Photos of the stand before dismantling
  • Pack and label fragile exhibits separately
  • Book collection after the show with the forwarder
  • Fix the staging date before the next show
  • Check the next show's traffic guide
  • Reorder missing parts and repairs after checking the return

Key terms

  • Traffic guide: the show's rules for access, loading zones and time slots
  • Loading zone: area on the grounds for loading and unloading, often to be booked
  • Return: stand material coming back to storage after the show
  • Staging: date on which the material is ready for collection

What does it cost to store an exhibition stand? The cost drivers

A fixed price per stand cannot be quoted seriously, because stands vary greatly in volume, number of packages and frequency of use. For pricing four factors matter most: how much space the material takes up (pallets, mesh boxes, crates or bulky items), how long it stays between two shows, how often it is moved in and out, and how thoroughly it should be checked on return. Bring these four details and you get a quote with traceable items rather than a lump sum. How such items are generally structured is shown in calculating storage costs.

Packing list: how to structure it

The packing list is the key document of trade fair storage. It is created at first storage and updated after every show – missing or added parts are noted straight away.

ColumnContentWhy
Package no.running number, also on the packagecompleteness at a glance
Contentse.g. wall panels 1–4, connectors, printed display graphicstargeted finding without opening
Dimensions and weightlength × width × height, gross weightplanning space and vehicle
Show / standcode of the event or stand typestaging per show
Conditionnote at storage and returnassigning damage to a show

Timeline around a show

The timings are guide values; what counts are the show organiser's build-up and dismantling deadlines and the time your forwarder needs.

  • About eight weeks before: tell the warehouse the show, build-up date and required staging; book the forwarder for transport to the grounds
  • About four weeks before: reconcile the packing list, reorder missing or damaged parts
  • About two weeks before: fix the staging date; about one week before, confirm date and collection time with warehouse and forwarder
  • Staging: material complete per packing list, handover to the forwarder with signature
  • Return: receiving with count and condition note, photos of damage, packing list updated
  • After return: arrange repairs or replacements before the next show

Shows outside the EU: ATA Carnet

If the stand goes to a show outside the European Union, an ATA Carnet can ease temporary export and import: in participating countries this customs document replaces national customs declarations for goods that return after the event. In Germany it is issued by the chambers of commerce and industry. For the warehouse this means the packing list must match the carnet's list of goods, and on return we check that everything is back. You or your forwarder handle the customs formalities themselves.

Typical trade fair storage mistakes

MistakeConsequenceRemedy
Material taken back uncheckeddamage only noticed at the next build-upcondition note at every return
Exhibits and stand build mixedsearching at stagingseparate packages, own labels
Staging requested too latebottleneck on build-up dayreport dates early
Consumables stored as wellitems spoil or go missingbuy consumables fresh before each show
Several stands without codeswrong parts go outcode per stand on package and list

What your warehouse should know about your stand

  • number and type of packages, dimensions and weights
  • fragile parts, glass, electronics, do-not-stack
  • whether exhibits are to be stored separately from the stand build
  • show calendar for the coming months, as far as known
  • who may trigger stagings
  • how damage is reported and repairs commissioned

The first delivery into storage: step by step

At first storage the packing list becomes the initial stock record. On every return, packages are checked against the packing list to the agreed inspection scope and any discrepancies are recorded. The sector overview is in warehousing for builders and exhibitors.

  • Send the packing list to the warehouse in advance, with dimensions and weights
  • Give advance notice of delivery – usually straight after dismantling at the last show
  • Receiving: count against the packing list, condition note, photos
  • Label every package with a stand or show code
  • Put-away, separating stand components and exhibits if required
  • Confirmation to you: what arrived, what is missing, what is damaged

The trade fair organiser’s rules

The rules for delivery and transport on the exhibition grounds are set by the organiser and apply to every forwarder. We do not store furniture.

Questions and answers: Storing exhibition stands

How do you store an exhibition stand properly?

With a packing list per package, a check on return, labels by stand and show, and fixed staging before the next show.

Who takes the stand to the show?

Your forwarder or stand builder, under the show's rules for loading zones and access. The warehousing provider stages the material for collection.

What does the show itself regulate?

Access, loading zones, time slots and transport on the grounds. The requirements are set out in the event's traffic guide or technical guidelines.

What does storing an exhibition stand cost?

Typically storage per place and period, receiving with a check against the packing list, and staging. The items are shown on the warehousing costs page.

How early before the show should the material be ready?

Early enough for your forwarder to keep its loading zone slot. It is best agreed about two weeks before the show.

What is an ATA Carnet?

A customs document for temporary export and import, for example of exhibition goods. It replaces national customs declarations in participating countries and is issued in Germany by the chambers of commerce and industry.

What happens if parts are missing on return?

The warehouse records the shortage at receiving and reports it to you, so you can follow up with the stand builder or forwarder while the show is still traceable.

Can exhibits be stored separately from the stand components?

That can be agreed in advance, based on the packing list and handling requirements. Exhibits are then labelled as separate packages and can be staged separately from the stand components.